Local Success Stories

Home / Country-by-country db / Italy / Local Success Stories

Local Success Stories

Country

Italy




Download pdf version
Download pdf version part II

#

Name of Example

Location

1

District Heating plant Ferrara

Ferrara




The Initiative

The District Heating plant in Ferrara is an integrated system of geothermal, waste incineration and reserve boilers. The system mainly uses the heat energy coming from the geothermal fluid extracted from the subsoil by means of two wells. The secondary source is depicted by the waste-to-energy plant, and another tertiary source of production is a thermal plant made up of 7 natural gas-powered boilers to produce hot water. The production system is composed by:

  1. geothermal renewable source;
  2. waste to energy plant;
  3. four storage tanks of 1.000 m3 individual capacity;
  4. thermal power station in S. Anna Hospital, built to balance water flow in the water distribution network;

At the end of the 1960s, an underground hot water basin was found, deep 2.000m in Casaglia. After 1970s energy crisis, the Joint Venture AGIP-ENEL made up the Geothermal Project, to use the geothermal basin for district heating.

Geothermal fluid is pumped towards the surface through two wells. The fluid releases energy to the district heating network through a heat exchanger, and finally re-injected in the underground through an intake well.

Today, with a water flow of 400 m3/h (at a temperature of 100°C), geothermal source contributes with 14MWt of the total power required.

The waste-to-energy plant in Ferrara is located inside the site called "geothermal power", where the district heating plant of the city of Ferrara is also situated. In operation since 1993 with a 150 t/day capacity treatment line, the plant attains heat recovery generated in the waste incineration process for the combined production of electricity and heat. Based on the season and needs, a part of the steam can be bled from the turbine to transfer energy to the adjacent district heating plant through a dedicated heat exchanger.

The waste-to-energy plant is being upgraded and redeveloped, and today is in the final completion stage. Two new waste-to-energy lines are planned in its final configuration. The two new lines have been in the start-up stage since November 2007.

District Heating Ferrara Plant (2008)

Total thermal energy delivered

165

GWht

Geothermal energy

66,54

GWht

Waste energy

19,59

GWht

boilers

79,07

GWht

Served buildings volume

5.170.000

m3

residential sector

2.364.000

m3

tertiary sector

2.802.000

m3

industrial sector

4.000

m3

Length of network

130

km

Number of users substations

530


Geothermal source



Total capacity

400

m3/hour

Geothermal fluid temperature

100-105 °C


Fluid supply temperature

90-95 °C


Fluid return temperature

60-65 °C


Nominal thermal power

14

MWt

Max energy generated

75.000

MWht/year

Continuous availability



Waste to energy plant



Treatment capacity

130.000

t

Electric power

13

MWe

Electric energy to network

87.000

MWhe

Max thermal power for DH

29

MWt

Thermal energy for DH

80.000

MWht

Thermal Power Plant



Boilers power

84

MWt

Storage tank capacity

1000

m3

Integrative boiler power

12

MWt

Environmental energy benefits



TEP spared

8100


NOx avoided

27.400

kg

SO2 avoided

33500

kg

CO2 avoided

23300

kg

A. TECHNOLOGY

1. Waste receiving, storage and feed section

The plant has two ditches ( a main and an auxiliary) for storing incoming waste.

Total usable capacity is 5000 m3 to allow the furnaces to operate normally and with a continuous infeed, even if there are consecutive days without any receipt of waste. Two orange-peel buckets on a bridge crane run alternatively inside the building housing the main ditch, one as stand-by to the other, to perform the waste homogenizing functions in the ditch and to load them into the furnace hopper.

  1. Combustion line with moving grate furnace

The combustion chamber is the moving grate type with a water cooling system, able to treat waste with a calorific value ranging from 6700 to 16,750 kJ/kg.

To achieve utmost flexibility, the system supplying the material onto the grate is fitted with a double feed-pusher. The material is transported onto the grate by a sloping chute, also water-cooled. The slope of the grate is 14 degrees, and it is sized in such a way as to adequately handle the changes in calorific value.

The combustion air system includes a primary air system with a total of 5 fans, three air/steam pre-heating exchangers with adjustable bypass for the air, and a secondary air system with 2 fans. All of the fans have speed adjustment with inverters, and the primary and secondary air flows for each zone and for each lane of the grate are automatically measured and adjusted. The primary air is blown in underneath the material through the cracks in the plates of the grate surface.

In all, there are 5 air inlet zones, the first and last of which have 4 steps each, whereas the zones in the middle have 6 steps each. The rows of moving steps, totalling 13, are operated separately by two hydraulic cylinders installed on the sides. Every step of a single lane of the grate consists of two plates forming a joined chamber structure, built so that the cooling water can go through the steps and cool the metal surface of the grate.

A fumes recirculation system is envisaged to control the combustion temperature and reduce the production of undesirable emissions, such as NOx. These fumes are withdrawn downstream of combustion fumes neutralisation. The combustion control system developed by the grate manufacturer provides better control and management via PLC.

Ten hoppers connected to a wet collection system (Redler) are envisaged to remove the ash underneath the grate. The system transports and releases the material into the various zones to the waste extractor. Water also plays the role of a seal, preventing air from getting into the combustion system. The extractor is driven by two hydraulic cylinders connected to the main hydraulic station that controls the infeed system and grate system.

3. Waste storage prior to disposal or recovery at authorised plants

The waste leaving the extractor of each furnace is conveyed on a vibrating table whose purpose is to uniform its flow, and from here to an iron removal system and then to the main conveyor belt that transfers it to the deposit area.

Separated ferrous materials are accumulated in a storage ditch. The waste is stored in heaps inside the building where the deposit area is located, whereas special doors allow lorries to enter to load it and then transfer it to the recovery/disposal plant.

  1. Steam generator

The back boilers installed on the two new lines are the natural circulation type, with cylindrical body placed at the top of the structure. They can produce 32.4 t/h of steam each. The exchange area consists of 4 vertical radiancy chambers and a horizontal convection channel containing the exchange banks. The saturated steam leaves the cylindrical body through several outlets that then flow into just one pipe connected to the inlet manifold of the superheater. The boiler is equipped with flat, insulated doors bolted to special frames so that the entire circuit of fumes and pipes can be thoroughly inspected.

Hoppers for collecting ashes the fumes deposit during reversal of direction or that have detached during mechanical cleaning are underneath both the radiancy zone and the convective zone. The maximum slope is 35° so as to make unloading the ashes easy and sure. Furthermore, a flange interfaces the lower part with the clapets so they can be scavenged.

5. Gas treatment line

A new, completely dry, gas treatment system has been designed for the two new lines (line 2 and line 3). Two reactor-filter systems installed downstream of the back boiler have been envisaged for each line, to then be followed by an ammonia-injection SCR system.

Lime hydrate and activated carbon will be injected into the first reactor-filter system to reduce acids via salification, and dioxins, organic substances and volatile metals via adsorption. The salts and adsorbent carbon will then be blocked and collected in the bag filter and sent to the three residual calcic product storage silos by a pneumatic system. Sodium bicarbonate and, if necessary, activated carbon will be injected into the second reactor-filter system to reduce, by salification, residual acids that have not reacted with the lime and, by adsorption, dioxins, organic substances and residual volatile metals. This second stage will also considerably reduce SO2. The salts and adsorbent carbon, if any (hereinafter called residual sodic product), are blocked in the bag filter in this case as well, and sent to storage in a silo.

A catalytic system with 24% ammonia solution (SCR) injected is envisaged downstream of the double filtration stage described above to reduce NOx, which also however contributes to reducing residual organic compounds, particularly the dioxins. The plant adopted in the project efficiently operates at low temperatures (no lower than 180°C) and ensures an annual mean concentration of NOx at the chimney lower than 100 mg/Nm3. The vaporized ammonia in the reactor is injected directly into the gaseous flow upstream of the catalytic converter, where the nitrogen oxides turn into molecular nitrogen and water.

  1. Thermal cycle for the cogeneration of electricity and thermal energy (common to the two lines)

The steam coming from the new lines (line 2 and line 3) is sent to just one turboalternator having a nominal electric power of 12.9 MW. Based on the season and needs, a part of the steam can be bled from the turbine to transfer heat energy by adjusted withdrawal to the district heating system through a dedicated heat exchanger. In the cogeneration layout, the turboalternator will be able to supply 8.4 MW of electric energy and 26 MW of heat energy.

The steam leaving the turbogenerator is sent to an air condensation system. This system contemplates a geometric "saddle" configuration made up of four modules, arranged on two banks with two modules each.

B. MONITORING SYSTEMS

The two emissions points are monitored according to current regulations:

  • Continuous monitoring of the concentration of macro-pollutants (total dust, hydrochloric acid, NOx, sulphur oxide, carbon monoxide, total organic carbon, hydrofluoric acid, mercury, ammonia) and the process parameters, such as the oxygen level, humidity level, fumes flow rate, fumes pressure and fumes temperature;
  • Automatic continuous sampler for organic micro-pollutants, dioxins and furans.
  • Periodic monitoring of the organic micro-pollutants and heavy metals with analytical campaigns.
  • Periodic surveys concerning definition of the dimensional spectrum of the dust emitted, exploring the numeric concentration of particles (on every dimensional class) in the range between the manometres and 10 micrometres.

C. ENERGY SOURCES

1) Waste sources

Waste to Energy Ferrara Plant (2008)

Number of Treatment Lines:

2


Heat Capacity:

55,7

MWt

Combustion chamber tecnology:

Moving grate type with a water cooling system


Waste treatment capacity:

420

t/day

Lower heating value

2400

kcal/kg

Number of operating hours per year:

8000

hours

Nominal electric power:

12,9

MWe

Environmental emissions consistent with laws:

D.Lgs. 133/05


D.Lgs. 152/06


D.Lgs. 59/05


The waste-to-energy plant is ISO 9001 and ISO 14001-certified, and attained EMAS registration in 2004.

2) Other sources

Thermal energy system is completed by a thermal power station with 4 natural gas powered-boilers and 4 storage tanks, for the thermal energy daily-variability demand management.

District Heating Hera Spa

Total thermal energy delivered

422.633

MWh

Served buildings volume

16.109.000

m3

Number of equivalent housing units served

53.696


Length of network

312

km

District heating procurement mix

Energy CCGT

1%


Gas fired cogeneration plants

17%


Geothermal

13%


Energy recovery from WTE

11%


Domestic gas fired system

58%





#

Name of Example

Location

2

District Heating Alto Garda

Riva del Garda, Trento

The Initiative

The DHC system at Riva del Garda in Trento Province, owned and managed by Alto Garda Servizi Teleriscaldamento (AGST) of the Alto Garda Servizi Group (AGS), will reduce annual energy consumption of Riva del Garda District (16.000 inhabitants) by about 6.700 toe, and decrease around 30% overall air emissions of the town and around 10% the CO2 emissions.

The project initiated in September 2006, when AGS and Cartiere del Garda (local paper mill industry) constituted a new company, the Alto Garda Power with the mission to build and and manage a cogeneration power plant. In the meanwhile, the Alto Garda Servizi Teleriscaldamento company was constituted in order to design, built and manage the district heat grid.

The construction od the CHP plant and of the heat distribution system started in June 2007 and the first customer was connected in october 2008.

A relevant extension of the heat grid in Riva del Garda is planned in 2010; the possibility to deliver the heat up to Arco district (over 16.000 inhabitants, located at about 5 km) is also planned for the near future.

The main technical data of the project are summarised in the following table:

CHP Plant:

Cogeneration plant

Gas turbine combined with a steam turbine with exhaust heat recovery

Electric power

45 MW (Gas turbine) + 7 MW (Steam turbine)

Global Thermal Energy

438 GWh/year

- thermal energy to the DHC grid

45 GWh/year

- thermal energy to the industry

393 GWh/year

Global efficiency

85%

Fuel utilised

Natural gas

Annual fuel consumption (2009)

106 MNm3

Annual electricity production

415 TWHe

District Heating system

Grid extension (2008 and 2009)

8,5 km

Substations number

170 (130 already connected)

Investment up to 2009

11,2 M€

Auxiliary boiler

n° 2

Delivered heat temperature

90 °C

Return heat temperature

65 °C



Grid extension (2010)

Up to 22 km

Global investment

Up to 20 M€

Substations number

Up to 1000

Heat grid management

It should be noted that the heat distribution pipework is equipped with a continuous on-line monitoring sytem of the operating conditions and for the failures detection, thus greatly improving the reliability and the safety of the service. The system assures as well the automatic collection of the energy consumed by each substation.

The utilization of recovery heat, and the high efficiency heat generation provided a valuable service to the customers, identified as follows:


Social and environmental benefits

The DHC system in Riva del Garda allows an excellent synergy between a strong touristic vocation district and a modern industry mainly based on the utilisation of local resources. The consequent emission reduction resulting from DHC constitutes an important environmental element, particularly appreciated by the foreign tourists.

Furthermore, the realization of the DHC system has been a key element for the refurbishing of the existing low efficiency cogeneration power plant, contributing to the economic and environmental sustainability of the local industry, which represents an important social element for the town.

The realization of the initiative has beneficiated of a clear committment from the local authorities. The main obstacle, at the beginning of the project, was represented by the an uncertain potential customers acceptance. However, this problem has been overcome due to the good technical performances of the system and the good economic conditions offered for the delivery of the heat sevices.




















Print Send Map

Country-by-country db

    • Welcome
    • DHC Benefits
    • Background
    • Objectives
    • Expected outcomes
    • Deliverables
    • Consortia overview
    • DHC+ Technology Platform
      • DHC+ presentation
      • AGFW
      • BRE
      • Distretto Tecnologico Trentino
      • Euroheat & Power (EHP)
      • Finnish Energy Industries
      • Halmstad University
      • Lithuanian Energy Institute
      • Norwegian DH Association
      • Swedish DH Association
    • Non-DHC+ Partners
      • Aiguasol
      • Cogen Romania
      • Czech DH Association
      • Danish DH Association
      • Energy Institute Hrvoje Pozar
      • RPS Group
      • SNCU
    • News
    • Events
    • Project documents
    • Overview
    • Country Reports
    • Croatia
      • Recommendation Report
      • Overview of National DHC Market
      • Overview of DHC Legslative Framework
      • Support Measures For DHC
      • Implementation of EC Directives
      • Local success stories
      • Needs-Challenges-Barriers-Opportunities
      • Effectiveness of national support
      • DHC Benefits
      • DHC Benefits (HR)
    • Czech Republic
      • Road Map Report
      • Overview of National DHC Market
      • Overview of DHC Legislative Framework
      • Support Measures For DHC
      • Implementation of EC Directives
      • Local Success Stories
      • Needs-Challenges-Barriers-Opportunities
      • DHC Benefits
      • DHC Benefits (CZ)
    • Denmark
      • Recommendation Report
      • Overview of National DHC Market
      • Overview of DHC Legislative Framework
      • Support Measures For DHC
      • Implementation of EC Directives
      • Local Success Stories
      • Recommendations for policy makers
      • Needs-Challenges-Barriers-Opportunities
      • DHC Benefits
      • DHC Benefits (DK)
      • Checklist with good support scheme characteristics
      • Best practise support schemes
    • Finland
      • Recommendation Report
      • Overview of National DHC Market
      • Overview of DHC Legislative Framework
      • Support Measures For DHC
      • Implementation of EC Directives
      • Local Success Stories
      • Recommendations for policy makers
      • Needs-Challenges-Barriers-Opportunities
      • DHC Benefits
      • DHC Benefits (FI)
    • France
      • Road map
      • Overview of National DHC Market
      • Overview of DHC Legislative Framework
      • Support Measures for DHC
      • Implementation of EC Directives
      • Local Success Stories
      • Needs-challenges-barriers-opportunities
      • DHC Benefits
      • DHC Benefits (FR)
    • Germany
      • Road Map Report
      • Overview of National DHC Market
      • Overview of DHC Legislative Framework
      • Support Measures For DHC
      • Implementation of EC Directives
      • Local Success Stories
      • Needs-Challenges-Barriers-Opportunities
      • DHC Benefits
    • Ireland
      • Recommendation Report
      • Overview of National DHC Market
      • Support Measures For DHC
      • Overview of DHC Legislative Framework
      • Implementation of EC Directives
      • Local Success Stories
      • Recommendations for policy makers
      • Needs-Challenges-Barriers-Opportunities
      • DHC Benefits
    • Italy
      • Recommendation Report
      • Overview of National DHC Market
      • Overview of DHC Legislative Framework
      • Support Measures For DHC
      • Implementation of EC Directives
      • Local Success Stories
      • Needs-Challenges-Barriers-Oppurtunities
      • DHC Benefits
      • DHC Benefits (IT)
    • Lithuania
      • Recommendation Report
      • Overview of National DHC Market
      • Overview of DHC Legislative Framework
      • Support Measures For DHC
      • Implementation of EC Directives
      • Local Success Stories
      • Recommendations for policy makers
      • Needs-Challenges-Barriers-Opportunities
      • DHC Benefits
      • DHC Benefits (LT)
    • Norway
      • Recommendation Report
      • Overview of National DHC Market
      • Overview of DHC Legislative Framework
      • Support Measures For DHC
      • Implementation of EC Directives
      • Local Success Stories
      • Recommendations for policy makers
      • Needs-Challenges-Barriers-Opportunities
      • DHC Benefits
      • DHC Benefits (NO)
    • Romania
      • Recommendation Report
      • Overview of National DHC Market
      • Overview of DHC legislative Framework
      • Support Measures For DHC
      • Implementation of EC Directives
      • Local Success Stories
      • Needs-Challenges-Barriers-Opportunities
      • DHC Benefits
      • DHC Benefits (RO)
    • Spain
      • Overview of National DHC Market
      • Overview of DHC Legislative Framework
      • Support Measures For DHC
      • Implementation of EC Directives
      • Local Success Stories
      • DHC Benefits
      • DHC Benefits (ES)
      • Needs-Challenges-Barriers-Opportunities
    • Sweden
      • Recommendation Report
      • Overview of National DHC Market
      • Overview of DHC Legislative Framework
      • Support Measures For DHC
      • Implementation of EC Directives
      • Local Success Stories
      • Needs-Challenges-Barriers-Opportunities
      • DHC Benefits
      • DHC Benefits (SE)
    • United Kingdom
      • Road Map Report
      • Overview of National DHC Market
      • Overview of DHC Legislative Framework
      • Support Measures For DHC
      • Implementation of EC Directives
      • Local Success Stories
      • Needs-Challenges-Barriers-Opportunities
      • DHC Benefits
    • Overview
    • Comparison
      • - Size and Development
      • - Heat sources and sustainability
    • Austria
      • - Size and Development
      • - Heat sources and sustainability
    • Czech Republic
      • - Size and Development
      • - Heat sources and sustainability
    • Denmark
      • - Size and Development
      • - Heat sources and sustainability
    • Finland
      • - Size and Development
      • - Heat sources and sustainability
    • France
      • - Size and Development
      • - Heat sources
    • Germany
      • - Size and Development
      • - Heat sources and sustainability
    • Italy
      • - Size and Development
      • - Heat sources and sustainability
    • Lithuania
      • - Size and Development
      • - Heat sources and sustainability
    • Norway
      • - Size and Development
      • - Heat sources and sustainability
    • Sweden
      • - Size and Development
      • - Heat sources and sustainability
    • Meetings and documents
    • Edit Profile & Notifications
    • Project Coordinator
    • Links

© 2011 EcoHeat4.eu

by WebsiteprojectsLogin

The sole responsibility for the content of this website lies with the authors. It does not necessarily reflect the opinion of the European Union. Niether the EACI nor the European Commission are responsible for any use that may be made of the information contained therein.